Abstract:
As the height of high-rise building increases with the height of building, the stiffness of core tube structure decreases. The change of core tube structure has a great influence on hydraulic climbing formwork. Meanwhile, the reinforced layer of super high-rise building also has a great influence on hydraulic climbing formwork. Based on the Wanda Plaza Project in Xishan, Kunming, this paper introduces the climbing formwork treatment of hydraulic climbing formwork installation, operation and demolition, as well as the change of core tube structure and strengthening location.
ZHANG Mao,SHI Li-guo,LI Zeng-yu et al. Construction technology of super high-rise hydraulic climbing mould[J]. Architecture Technology, 2018, 49(10): 1090-.