PBA工法在地铁车站工程中的应用与控制要点
伍锦鹏
北京建工土木工程有限公司,100015,北京
Application and Key Control Points of PBA Construction Method in Subway Station Project
WU Jin-peng
BCEG Civil Engineering Co., Ltd., 100015, Beijing, China
摘要 北京地铁6号线西延工程西黄村站为暗挖车站,采用PBA工法施工。在导洞、边桩基础、扣拱、二次衬砌、防水施工及顶纵梁间支撑设置等工序制订施工控制要点,实施效果良好。
关键词 : 地铁车站
PBA工法
导洞
边桩
Abstract :
The West Huangcun Station of Beijing subway line 6 westward extension project is a subsurface excavation station and PBA construction method was adopted. Key control points were established for various construction steps, such as pilot tunnel, side pile foundation, buckle arch, secondary lining, waterproof construction and support setting among top stringer beams, etc., realizing favorable construction effect.
Key words : subway station PBA construction method pilot tunnel side pile
[1]
郭志明,虞星晨,王栋旭. 泉域地区地铁车站地下连续墙叠合体系与复合体系对比分析 [J]. 建筑技术, 2018, 49(11): 1149-.
[2]
王宏斌. 地铁明挖车站局部下穿既有建筑物施工技术 [J]. 建筑技术, 2018, 49(11): 1156-.
[3]
赵国. 新建地铁车站紧邻既有地铁车站施工技术 [J]. 建筑技术, 2018, 49(11): 1160-.
[4]
谢申举,王栋旭,郑立志. 地铁车站叠合墙裂缝生成机理与控制要点 [J]. 建筑技术, 2018, 49(11): 1174-.
[5]
郑立志,郭佳,屈鹏. 机械化凿毛在地铁叠合车站中的应用 [J]. 建筑技术, 2018, 49(11): 1182-.
[6]
孙飞跃1,刘清1,贺琪2,韩风霞1,何原野1. 基于灰色理论的地铁沉降预测研究 [J]. 建筑技术, 2017, 48(7): 761-.
[7]
何福军,郭志明,丁贵松. 北京地铁京顺路站地下连续墙施工技术措施 [J]. 建筑技术, 2017, 48(6): 623-.
[8]
丁贵松. 地铁车站先隧后站施工技术 [J]. 建筑技术, 2017, 48(6): 613-.
[9]
仇伟,康建新,董佳节. 热力管沟跨越预留地铁车站承托平台施工技术 [J]. 建筑技术, 2016, 47(3): 198-.
[10]
韦 京, 杜林林, 孙明志. 地铁车站PBA工法小导洞施工方案优化研究 [J]. 建筑技术, 2014, 45(9): 796-799.
[11]
曹忠民,王奇松,杨一炯. 地铁基坑钢支撑架设与拆除安全监控 [J]. 建筑技术, 2012, 43(6): 493-496.
[12]
柳利丽, 胡长明, 梅 源. 黄土地区地铁车站深基坑降水设计与施工 [J]. 建筑技术, 2012, 43(1): 55-57.
[13]
柳利丽, 胡长明, 梅源. 某地铁车站深基坑旋喷桩止水帷幕施工技术 [J]. 建筑工人, 2011, 42(12): 1078-1081.
[14]
张丽丽,王奎岩,潘天华. 地铁望京东站墙体模板施工技术 [J]. 建筑工人, 2011, 42(08): 700-702.
[15]
马艳春. 高速公路连拱超浅埋隧道下穿104国道施工技术 [J]. 建筑工人, 2011, 42(08): 754-757.