Abstract:
During D1400mm water supply and drainage pipeline construction of Beijing Tucheng Beiqiao District water accumulation treatment project, various technical measures were adopted, such as pre-strengthening before jacking, jacking speed control, earth excavation quantity, slurry chamber pressure, etc. Pipe jacking construction was adjusted timely according to practical monitoring information, to realize dynamic management and to control the deformation within the allowable range.