The total length of Chaoyang district the third bridge segment sewage pipeline of Beijing water environment treatment engineering is 9 045 m, among which 1363m was constructed by using micro-pipe jacking (spiral earth removal) method. Comparing with conventional method, micro-pipe jacking method has many advantages, such as convenient construction in downtown area, small relocation workload, small noise and little influence on ground traffic, etc.
LIU Bing-wang,LIU Yu-fei,YANG Dan et al. Application of Micro-pipe Jacking Technique
in Sewage Pipeline Construction[J]. Architecture Technology, 2018, 49(11): 1218-.