Abstract:
During lifting construction of tube truss arch steel structure roof as a whole in Harbin railway station rebuilding project, the lifting scheme was established according to field conditions and computer-controlled hydraulic synchronized lifting technique was adopted, to successfully realize smooth transition and unloading of load-bearing system, as well as accurate connection at high altitude. The limitation of small construction site was effectively solved and high-altitude construction risk was reduced, realizing favorable economic benefits.