Abstract:
Fufengqiao station of Beijing subway line 16 passes through under an urban overpass, so, protection measures shall be adopted to guarantee safety and stability of the overpass base. Dry hole forming, mechanical hole forming by using full casing and pressure pipe and segment installation of steel cage were adopted for construction on sand gravel stratum to guarantee smooth isolation pile construction under overpass.